Plans start at $199/month — page-metered billing, cancel anytime.Get started →
Multi-Discipline AI Review System

AI-Powered
Construction Plan
Review

PermitGuard uses advanced AI agents to automatically review construction and engineering plans against municipal codes and regulations.

Traditional permit review preparation can cost thousands of dollars and weeks of back-and-forth revisions. PermitGuard performs automated compliance analysis in minutes.

  • Specialist discipline agents
  • Identify code violations early
  • Local & municipal code research
  • Save thousands on consulting
PermitGuard project dashboard showing uploaded construction drawings, discipline scopes, and drawing annotations for AI-powered permit compliance review

Permitting Is Slow, Expensive, and Unpredictable

Construction projects often face delays because permit drawings must comply with complex municipal codes and regulations. Developers and engineers frequently rely on expensive consultants or repeated submissions to ensure their plans meet requirements.

Expensive Consulting

Pre-permit consulting fees can run thousands of dollars per project, just to identify potential issues.

Long Review Cycles

Municipal reviews can take weeks or months, stalling project timelines and increasing carrying costs.

Unexpected Issues

Compliance problems discovered late in the review process are costly and time-consuming to fix.

Multiple Resubmissions

A single missed requirement triggers costly redesign cycles and permit resubmissions.

Delayed Timelines

Project schedules slip when compliance issues are discovered at the municipality, not before.

Complex Code Landscape

Every municipality has its own codes. Navigating IBC, local amendments, and special requirements is overwhelming.

A single missed requirement can result in weeks of delay and thousands in additional costs.

PermitGuard Uses AI Agents To Review Plans Automatically

PermitGuard uses specialized AI agents trained to analyze construction drawings, engineering documents, and regulatory requirements. These agents work together to evaluate plans for potential compliance issues, flag risks, and provide actionable feedback before submission.

Instead of waiting weeks for feedback from a municipality, PermitGuard can provide an initial compliance analysis within minutes.

Specialist review per discipline
Every drawing individually analyzed
Local & municipal code research
Cross-discipline coordination checks
Quality-validated findings
Detailed reports with code citations
PermitGuard AI agent running a full project review — jurisdiction resolution, drawing extraction, specialist discipline reviews, and report compilation

How It Works

From upload to a full specialist compliance report in minutes

1

Upload Your Plans

Upload your PDF drawings — architectural, structural, MEP, civil, and specs. Each sheet is automatically classified by discipline.

2

Specialist Review Runs

Discipline-specific AI reviewers analyze each set of drawings in parallel against the adopted codes and local amendments for your jurisdiction.

3

Quality-Validated Report

All findings go through an internal validation pass before you see them. You receive a scored, prioritised report with specific code citations and confidence ratings.

4

Submit With Confidence

Address the findings, re-run as many times as you need, and submit your permit application knowing potential issues have been surfaced.

New submission modal in PermitGuard where users paste municipality reviewer comments and mark accepted drawings for the next compliance review cycle
Agentic Architecture

A Full Permit Review Firm — Powered by AI

PermitGuard's AI system mirrors the structure of a real permit review shop — with specialist reviewers per discipline, local code expertise, and a quality control layer — all running in parallel and delivering results in minutes.

Structural

Foundation, framing, lateral force-resisting system, seismic & wind design, load path, connections

Life Safety

Occupancy classification, means of egress, fire-rated assemblies, sprinkler & alarm requirements, accessibility

MEP Systems

HVAC, ventilation, electrical service & panels, plumbing fixture counts, fire suppression & alarm systems

Site & Zoning

Setbacks, lot coverage, building height, parking, grading, accessible site routes

Energy Code

Building envelope, equipment efficiency, lighting power, compliance path documentation

Every Drawing Gets Dedicated Attention

Each sheet in your plan set is individually reviewed by the specialist for its discipline — no drawing is skipped or diluted because the set is large.

Local Codes, Not Just IBC

PermitGuard understands that every municipality adopts and amends codes differently. The system researches jurisdiction-specific requirements for your project address — not a generic national standard.

Quality-Controlled Before Delivery

Every finding goes through an internal validation pass before you see it — reducing false positives, consolidating overlapping issues, and ensuring confidence levels are accurately reported.

PermitGuard building code compliance report showing submission readiness score, risk overview with high, medium, and low findings, and per-discipline scoring breakdown
Code Compliance Registry

Over 500 Building Code Requirements Checked

Every analysis is powered by a deterministic requirement registry spanning every major building code discipline — from IBC and IRC structural checks to NEC electrical, NFPA fire protection, and ADA accessibility.

500+
Code Requirements
Checked per project
12
Code Families
IBC, IRC, NEC, and more
5
Specialist Agents
Review in parallel
100%
Drawing Coverage
Every sheet reviewed
  • IBC
  • IRC
  • NEC
  • IPC
  • IMC
  • IECC
  • IFGC
  • NFPA
  • ADA/A117.1
  • IFC
  • ASCE 7
  • Zoning

Structural integrity, life safety egress, mechanical ventilation, electrical circuits, plumbing fixtures, energy envelope, fire protection sprinklers, ADA accessibility, and zoning setbacks — all analyzed deterministically with AI-powered review for anything that can't be verified from the drawings alone.

Save Thousands on Compliance Reviews

PermitGuard delivers professional-grade compliance analysis at a fraction of the traditional cost.

Traditional Process

  • Hire consultants ($2,000–$10,000+)
  • Manual plan reviews
  • Weeks of turnaround time
  • Expensive pre-submission reviews
  • No iteration before submission
  • Opaque, slow feedback
PermitGuard

PermitGuard

  • Automated AI analysis
  • Minutes instead of weeks
  • Upload plans instantly
  • Fraction of the cost
  • Iterate before submission
  • Clear findings with code citations

PermitGuard analyses cost a fraction of what traditional consulting reviews charge — saving you thousands of dollars per project.

Built For Construction Professionals

Anyone preparing permit submissions can benefit from faster and more predictable compliance reviews.

Developers

Architects

Civil Engineers

General Contractors

Design-Build Firms

Permit Expeditors

AI-Assisted Review

PermitGuard provides automated analysis to help identify potential compliance issues. Construction codes and regulations may be interpreted differently by local authorities. Users should always verify findings and consult local municipalities or qualified professionals when necessary.

Start Your First Analysis

Upload your plans and see how PermitGuard can help identify compliance issues before submission.

Plans start at $199/monthPage-metered billing — pay only for what you reviewCancel anytime